IESCO New Meter Connection

If you are getting a new electricity connection from IESCO, It is the best step toward accessing reliable electricity for homes and businesses in Islamabad, and nearby areas. IESCO known for its best service and transparency, IESCO offers a streamlined process to make applying new connections online or physically is very simple and stress free.

Whether you are a new homeowner or setting up a business, this guide provides everything about IESCO New Connection you need to know step by step instructions, fee, required documentation, and timelines to help you get connected without any hassle. Let’s explore how IESCO makes powering your future easy and reliable.

Requirements For IESCO New Connection

Category

Details

Personal Documents

Attested copy of CNIC (applicant and witness)

Property Documents

Proof of ownership or tenancy (property papers or rental agreement)

Additional Documents

No Objection Certificate (NOC) if applicable, neighbor’s IESCO bill

Technical Details

Site plan/building layout, load requirement details

Application Details

Completed application form available from IESCO

Payment Proof

Fee deposit lip for processing the application

Verification Process

Inspection approval report by IESCO field staff

Application Process For New IESCO Connection

To apply for a new electricity connection from IESCO, follow these simple steps for the online application process:

IESCO New Meter Connection Form
  • Visit ENC Website: Go to the IESCO New Connection (ENC) portal.
  • Fill the Online Application: Complete the form with accurate details.
  • Upload Documents: Provide necessary scanned copies like ownership proof, CNIC, and others.
  • Submit the Form: Submit the completed application form online.
  • Print the Application: After submission, print a copy of the form.
  • Documents: Attach the required documents to the printed application.
  • Form Submission: Submit required documents and print out application for to the nearby IESCO office.
  • Receive Demand Notice: After document verification, you will receive a Demand Notice.
  • Pay the Demand Notice: Pay the demand amount at the nearest bank.
  • Submit Payment Proof: Provide a copy of the paid Demand Notice to the IESCO office.
  • New Connection: Once payment is verified, your new electricity connection will be activated.

Required Documents

For a smooth new connection application process, ensure the following documents are prepared:

  • Online Application Form: Filled and submitted.
  • Ownership Proof or Tenancy Agreement: Provide evidence of ownership or tenancy.
  • Undertaking Statement: A declaration by the applicant.
  • Power of Attorney: If applicable.
  • No-Objection Certificate: Required from the property owner for tenants.
  • Attested CNIC: Applicant’s CNIC photocopy.
  • Witnesses’ CNICs: Witnesse attested CNICs two copies (if applicable).
  • Tariff Copy: Signed copy of the concerned tariff, if applicable.

Make sure to verify specific document requirements for your connection type to avoid any delays.

IESCO New Electricity Connection Fee

After your application is approved and inspection is completed, IESCO will send a Demand Notice detailing the fees and charges. Ensure you pay the specified amount within the given timeframe to continue the connection process. IESCO offers several payment methods, including banks, e-wallet payments, and cash payments at counters.

The fees for new connections is depending on the length and type of WAPDA meter under Tariffs A1 and A2 are structured in IESCO website:

Single Phase Meter

For Single Phase Meter connections, the charges are as follows based on the service line length:

  • Up to 20 meters: Rs. 8,500
  • Above 20 and up to 30 meters: Rs. 10,500
  • Above 30 and up to 40 meters: Rs. 11,500
  • Above 40 meters and up to 100 meters (with one span LT with Ant Conductor and one Pole, excluding housing societies): Rs. 11,000 + Rs. 800 per meter above 40 meters
  • Above 100 meters and up to 160 meters (with two spans LT with Ant Conductor and two Poles, excluding housing societies): Rs. 60,000 + Rs. 1,000 per meter above 100 meters

Three Phase Meter

For a Three-Phase Meter connection, the charges are based on the length of the service line. The fees are:

  • Rs. 36,500 for service lines up to 20 meters.
  • Rs. 43,000 for service lines up to 30 meters.
  • Rs. 50,000 for service lines up to 40 meters.

For service lines exceeding 40 meters, additional costs will be determined based on the actual prices of LT poles and allied materials, as specified by IESCO’s Chief Engineer.

Required Time For IESCO New Electricity Connection

The time required for a IESCO new connection from IESCO typically depends on the completion of various steps, including application submission, document verification, inspection, payment of the installation, and demand notice. Here is a timeline:

  • Application and Document Verification: 7–10 working days.
  • Inspection and Demand Notice Issuance: Within 15 working days after verification.
  • Payment and Approval: 7–10 working days after payment submission.
  • Connection Installation: after payment verification 10 to 15 days.

The complete procedure may take 30 to 45 days, The entire process may take approximately 30–45 days, it will be timely completion of each part, and absense of any complication. For exact timelines, consult IESCO’s customer service or official guidelines.

FAQ’s

You can contact through multiple methods to IESCO call 118 or 051-9252937, WhatsApp at 0343-8881000, or email customercare@iesco.com.pk.

Apply for new connection in Pakistan is very easy, visit official electricity provider site, apply online and provide required documents.

To connect your meter, submit your application, provide required documents, pay the demand notice, schedule an inspection, and wait for the utility company to install the meter.